albert180

joined 3 weeks ago
[–] albert180@discuss.tchncs.de 47 points 6 days ago* (last edited 6 days ago)

NewPipe or Patched YouTube App using ReVanced Manager

[–] albert180@discuss.tchncs.de 12 points 1 week ago (5 children)

Just use Syncthing?

[–] albert180@discuss.tchncs.de 14 points 1 week ago* (last edited 1 week ago) (2 children)

You can read more Here

If you try to rate-limit them, they'll just switch to other IPs all the time. If you try to block them by User Agent string, they'll just switch to a non-bot UA string (no, really). This is literally a DDoS on the entire internet.

https://pod.geraspora.de/posts/17342163

[–] albert180@discuss.tchncs.de 9 points 1 week ago

They just Fake User Agents If you Block them

 

geteilt von: https://discuss.online/post/14874363

Russian servicemen are instructing their soldiers positioned closer to the frontline to shoot and torture the local population, according to an investigation by the 3rd Assault Brigade of the Ukrainian Armed Forces (AFU).

[–] albert180@discuss.tchncs.de 11 points 2 weeks ago

They didn't even funded it without COVID, that drug was developed at a University IIRC

[–] albert180@discuss.tchncs.de 31 points 2 weeks ago (5 children)

Lol, what R&D Costs for already developed drugs?

[–] albert180@discuss.tchncs.de 2 points 2 weeks ago

Well His stupid comments and interference aren't against the law here

[–] albert180@discuss.tchncs.de 7 points 2 weeks ago (4 children)

What did they do?

[–] albert180@discuss.tchncs.de 4 points 3 weeks ago

The new Reactors in France surely produce a Lot of Cheap Energy. Sure the construction alone was only 6x more expensive than planned, but I'm sure it's still a bargain at 20 Billion Euros

https://www.lemonde.fr/les-decodeurs/article/2024/05/09/les-derapages-de-l-epr-de-flamanville-en-graphiques-le-cout-multiplie-par-six-la-duree-du-chantier-par-quatre_5480745_4355771.html

In the UK Hinkley Point C is also a great success with cost overruns amounting to now over 35 Billion Pounds

https://www.theguardian.com/business/2024/jan/23/hinkley-point-c-could-be-delayed-to-2031-and-cost-up-to-35bn-says-edf

[–] albert180@discuss.tchncs.de 1 points 3 weeks ago (1 children)

Every Village thinks it's a wonderful Holiday destination, burying the lines IS costly and inefficient and we pay all for it with interest through the Network Fees.

We have Transmission lines Here too, and it's still a very liveable Environment.

Yes it's NIMBYism

[–] albert180@discuss.tchncs.de 8 points 3 weeks ago (2 children)

Yes the French Electric System would have collapsed without German Exports Last year (the French Heat with Electricity). It does matter

[–] albert180@discuss.tchncs.de 10 points 3 weeks ago (4 children)

You mean net exporting Energy to France because their shitty Nuclear Plants didn't Work Last Winter because of Maintenance and Last Summer because it was too hot for them?

view more: next ›